SAP Activate Content Updates for SAP S/4HANA Cloud

11 75 19,051

Updated June 20, 2022

SAP Activate provides a clear guided methodology to deploy, adopt and extend new capabilities across your organization. The SAP Activate implementation Roadmap Viewer is a tool used by the implementation project team members to navigate the phases, deliverables, tasks and accelerators related to the SAP Activate.

The implementation roadmap is updated frequently to contain the latest scope, processes and accelerators. The content updates occur throughout the quarter with final changes coinciding with the cloud solution release cycle.

This blog summarizes the changes for the roadmap SAP Activate Methodology for S/4HANA Cloud.

June 20 Release Notes

  1. Added two new tasks, Verify System Setting for Fit-to-Standard Workshop and Activate New Scope or Country/Region in Starter System via SAP Central Business Configuration, to deliverable, Fit-to-Standard System Preparation. These replace the deliverable, New Scope Activation via SAP Central Business Configuration.
  2. Removed deliverable, New Scope Activation via SAP Central Business Configuration, and related tasks from Explore. See related change above.
  3. Refreshed the Project Plan with the current content from the roadmap. Typically, this accelerator gets updated with each major release. To increase freshness, we will update 4 times per year.
  4. Replaced task, Self-Enable on SAP S/4HANA Cloud, with 3 simplified tasks, Complete SAP S/4HANA Cloud Onboarding Learning Courses, Access the SAP Enterprise Support Value Map for SAP S/4HANA Cloud, and Join the SAP S/4HANA Cloud Implementation Learning Room.
  5. Removed tasks, Document Preset Parameters for Manage Your Solution App and Document Scope Bundle for Manage Your Solution App. They are no longer relevant.
  6. Updated the description and procedure in task, Ensure Project team Members Access to the SAP Learning Hub.
  7. Updated task, Prepare Testing Prerequisites, with a new accelerator to the Automation Testing community.
  8. Updated task, Collect Details for Customer-Driven Integrations, with a new procedure step and procedure note.

June 3 Release Notes

  1. Removed tasks related to Manage Your Solution and the provisioning of the quality system. These are no longer relevant with SAP Central Business Configuration.
  2. Removed dual instructions from Request the Production System and Transport Initial Change Project from Q-System to P-System. Removed qualifiers from multiple SAP Central Business Configuration tasks since they are now relevant to all projects getting new systems.
  3. Renamed deliverable, Quality System Request / Initial Setup, to Initial Quality System Setup. Renamed task, Execute Initial Setup of the Quality System via SAP Central Business Configuration, to Execute Initial Setup of the Quality System.
  4. Updated the task, Ensure Project Team Members Access to the SAP Learning Hub, with improved description and additional procedure steps.
  5. Updated the OCM Customer Readiness Whitepaper in task, Execute the Cloud Mindset.

May 23 Release Notes

  1. Replaced the two tables that included the Service names, Estimated Completion Duration and Last Date to Request from task, Prepare for a Release Upgrade, with a process step listing the dos and don’ts on transports, scope/country activation when planning project activities around upgrade period. Note that the tables were related to the older Manage Your Solution processes which are now obsolete and replaced with SAP Central Business Configuration.
  2. Added 3 new procedure notes to task, Evaluate and Activate Feature from Continuous Delivery. Two are related to post upgrade testing and one to the SAP S/4HANA Cloud Release Assessment and Scope Dependency (RASD)
  3. Updated the general blogs link in task, Request SAP Cloud ALM Tenant, to be based on the SAP Cloud ALM tag and display results in date order.
  4. Updated the title of task, Set Up Evaluation Project in SAP Central Business Configuration, from Set Up Starter Project in SAP Central Business Configuration. SAP Central Business Configuration has changed the name of the initial project. Related accelerator titles are also updated. Added two new procedure notes related to the quality system request and upgrade window.
  5. Edited procedure step 2 in task, Subscribe to Cloud Integration Automation Service (CIAS) in BTP. Added a new procedure note related to automatic provisioning with SAP Cloud ALM.
  6. Added task, Maintain Test Process and Test Plan for Customer Test, in the Regression Test for SAP S/4HANA Cloud Upgrade
  7. Consolidated tasks, Provide Consent for Post Upgrade Testing, Maintain Master Transaction Data and Open Posting Periods, and Maintain Test User Credentials, into task Prepare for Post Upgrade Test.

May 8 Release Notes

  1. Updated the procedure notes in task, Create Users in the Starter System. Updated the link in accelerator Help – Manage Your SAP S/4HANA Cloud Identity and Access Management.
  2. Updated the Solution Adaption workstream in the phase/workstream graphic of the Overview tab.
  3. Add the procedure step 3 in task, Document Scope via SAP Central Business Configuration.
  4. Added procedure step 3 in task, Track Changes in Configuration. The process for SAP Central Business Configuration now is the same as with Manage your Solution.
  5. Updated task, Request New Scope or Country/Region Activation via SAP Central Business Configuration, with additional guidance on the number of countries that can be added in one iteration. Added accelerators, SAP Note 3151804 – Country Activation Guidance and Help – Project Experience. Updated the procedure notes.
  6. Updated task, Set Up Exchange Rates for New Country/Region, with clarification that steps 3 and 4 are not relevant to the starter system.
  7. Added a new accelerator, Blog – Accelerate SAP Cloud Solution Adoption With New Templates In SAP Activate, to task, Set up OCM Team and OCM Concept.
  8. Updated the procedure in task, Configure Identity and Access Management in the Q-System. Added new accelerator, Help – Manage Your SAP S/4HANA Cloud – Maintain Business Roles. Added procedure note stating that SAP strongly recommends the creation of Custom business roles to be used in the production system

April 25 Release Notes

  1. Eliminated four unnecessary accelerators from task, Access Starter System and Reset Password. Eliminated references to the IAS (Identity Authentication Service) in the procedure. The IAS is initially setup with SAP Central Business Configuration.
  2. Added a procedure step to task, Access the SAP Central Business Configuration, to include actions related to the initial access to the IAS.
  3. Removed references to ‘quarterly’ release updates from several tasks. SAP currently releases upgrades 2 times per year but has increased the use of continuous feature delivery.
  4. Renamed task, Test Preparation, to Prepare Testing Prerequisites.
  5. Updated task, Organizational Structure – Conduct Workshop, to focus on the SAP Central Business Configuration process instead of the older Manage Your Solution process. Removed unnecessary accelerators. Add the procedure note that the organizational structure cannot be deleted once activated.

April 11 Release Notes

  1. Renamed task, Prepare for Post Upgrade Testing by SAP, to Prepare for Post Upgrade Testing. Updated the description, procedure, and procedure notes.
  2. Renamed task, View Post Upgrade Test Result, to Analyze Post Upgrade Test Result and made updates to the procedure.
  3. Changes to the IPS (Identity Provisioning Service) and IAS (identity Authentication Service) applications referenced within various tasks. See the SAP Cloud Identity Services – Identity Authentication help for more information.
  4. Updated the procedures in tasks, Create Content Development Plan and Manage Content Design and Content Development.
  5. Updated the text in deliverable, Enablement Delivery, and in the related tasks, Train the Trainer and Plan Learning Logistics.
  6. Updated the procedure in task, Request Cloud Integration Automation Services (CIAS). Customers can now self-subscribe to the service.
  7. Added a procedure note to task, Execute Initial Setup of the Quality System via SAP CBC. Once certain SAP Central Business Configuration initial settings are activated, they cannot be changed

March 28 Release Notes

  1. Relocated deliverable, Needs Analysis for Users, and related tasks to the Explore phase.
  2. Added a new deliverable, Learning Needs Analysis for Project Team, and three new tasks, Identify Learning Needs for Project Team, Create Learning Curriculum based on SAP Standard Learning, and Conduct Business Review in order to include project team learning.
  3. Added a procedure step 5 to task, Document Enablement Strategy, and related accelerator, Enablement Strategy Overview.pptx.
  4. Added a new accelerator, Custom Extensions in SAP S/4HANA Implementations- Guide for Sr IT Leadership.pdf, to task Self-Enable on Extensibility.
  5. Edited procedure in task, Check for Available Products, to eliminate references to the SAP App Center. The SAP App Center has been combined with the SAP Store. Removed related SAP App Center accelerators.
  6. Added accelerator, Help – Key User Extensibility, to task, Detail Design on Key-User Extensibility.
  7. Replaced deliverable, Solution Extension Development, and related tasks with a consolidated deliverable, Development and Setup of Extensions in Quality/Test System, and to tasks, Setup and Develop Key-User Extensions and Setup and Develop Side-by-Side Extensions.

March 14 Release Notes

  1. Revised the SAP S4HANA Cloud Multi-Country Rollout accelerator to include SAP Central Business Configuration relevant instruction. The accelerator is assigned to Review Overview Documentation and other tasks.
  2. Remodeled the task, Check External Tax Partner Interface, including an updated title, revised procedure steps, new procedure note and a new accelerator, Help – Manage External Tax Postings. This will help customers to determine and process inconsistencies between systems.
  3. Moved tasks, Create Test Plan and Change Test Data Using Data Variant, from deliverable Automated Test Execution for SAP S/4HANA Cloud to deliverable Test Preparation for SAP S/4HANA Cloud.
  4. Added procedure note to task, View Post Upgrade Test Result, referencing accelerator Help – Analyze Automated Test Results User Guide.
  5. Added a procedure step 5 to task, Perform Initial Business Process Assessment for S/4HANA Cloud. The step associates the SAP Cloud ALM link functionality with the output of the assessment.
  6. Added a new link to tasks, Self-Enable on SAP Central Business Configuration and Access the SAP Central Business Configuration. The link takes the user to the related blog posts in the community.
  7. Added a new procedure note and accelerator to task Request New Scope or Country/Region Activation. The accelerator is a reference to SAP Note 3139304 – Automatic Activation of Advanced Valuations.
  8. Renamed accelerator, Expert Configuration and SSCUI Reference, to Configuration Activity. This terminology is consistent with BPX and SAP Central Business Configurations. This accelerator is used in several tasks including Document Configuration Values.
  9. Removed the Solution Adaption workstream deliverable, Enablement Assessment, and related tasks.
  10. Renamed task Review Enablement Strategy Research and Interviews to Conduct Enablement Strategy Research and Interviews. Updated the description and procedure.
  11. Removed Deliverable New Scope Activation via Manage your solution app (and the two tasks) in Explore Same deliverable and task remain unchanged for Realize and Run phase. SAP Central Business Configuration will be used for new implementations.
  12. Removed task Configure Customer Specific Fiscal Year Variant via Manage Your Solution App. SAP Central Business Configuration will be used for new implementations.
  13. Removed Configure your solution/ manage your solution related reference for the following tasks: Adapt Chart of Accounts and Maintain Profit Center Configuration. SAP Central Business Configuration will be used for new implementations
  14. Added dual procedures to task, Move Adaptations and Change Project, to accommodate both SAP Central Business Configuration and Manage your Solution configured systems.
  15. Added a new task, Self-Enable on SAP S/4HANA Identity and Access Management, to deliverable Customer Team Self-Enablement along with 3 new accelerators.

February 28 Release Notes

  1. Added three new accelerators to task Self-Enable on Artificial Intelligence. Automated List of Ongoing Projects for Terminated Employees (4P4), Automated Project Staffing for Commercial Projects (52D), and Organisational Flexibility for Professional Services Providers (5HD).
  2. Updated the accelerator SAP S/4HANA Cloud Onboarding Presentation.pptx in task Review Overview Documentation. Added an overview slide on SAP Central Business Configuration and removed references to Manage Your Solution.
  3. Added a new task, Select the Right Cloud Partner, to deliverable, Cloud Mindset Assessment, to guide customers to SAP partners.
  4. Translated the 2202 release to Japanese and Chinese.
  5. Several minor corrections to tasks in the Integration and Extensibility

February 10 Release Notes

  1. Add a procedure note to task Review Hotfix Collection Information on how to determine the corrections included in a hotfix collection.
  2. Updated the summary of activities in procedure step 1 of task Execute Initial Setup of the Quality System via SAP Central Business Configuration.

2202 Release Notes

  1. Added a new accelerator, SAP Note 2813743 – What to Consider When Replicating Workforce Persons in SAP S/4HANA Cloud, to task, Set Up Employee Central Integration (JB1).
  2. Added two new blog posts, Blog – Fit-to-Standard Mural Template and Blog – Fit-to-Standard: Inputs and Outputs, to task Prepare and Schedule Fit-to-Standard Workshops.
  3. Consolidated multiple testing accelerators into one accelerator link, Help – Testing in SAP S/4HANA. This accelerator is used in multiple Testing workstream
  4. Added a new accelerator, Intelligent Situation Handling, to task, Perform Initial Business Process Assessment for SAP S/4HANA Cloud.
  5. Updated the guidance in task, Adapt Chart of Accounts task under the Required Configuration Before System Use – SAP S/4HANA Cloud.
  6. Updates to the procedure in task, Perform Manual Rework on Production System, based on user feedback.
  7. Added accelerator, Release Upgrade Timeline, Best Practice and FAQ, to task, Prepare for a Release Upgrade.
  8. Updated the procedure in task, Request New Scope or Country/Region Activation via SAP Central Business Configuration.
  9. Removed accelerators, YouTube – User Authorizations and Blog – Mass Maintenance of Business Roles in SAP S/4HANA Cloud from task Document Identity and Access Management.
  10. Miscellaneous readability improvements to several deliverables and tasks.
  11. Check out the SAP Activate community at SAP.com and Follow us for the latest information.

January 4 Release Notes

  1. Removed the term ‘quarterly’ from several tasks and titles of accelerators related to the release cycles. SAP S/4HANA is scheduled to be released only 3 times in 2022.
  2. Consolidated several data migration steps in deliverable, Data Migration into the Quality/Test Tenant, in the Realize phase into on task Execute Data Migration Using Staging Tables.
  3. Removed the task, Transport Configuration Via Manage Your Solution App, from the Run phase. This procedure is in the Transport Configuration
  4. Added a link to the SAP Central Business Configuration help to task, Transport Configuration, and others.
  5. Replace the What’s New .pdf accelerator with a link to the What’s New Viewer in task, Request New Scope or Country/Region Activation via SAP Central Business Configuration, and other related tasks.

December 13 Release Notes

  1. Relocated deliverable, Standard Integration Setup in the Quality/Test Landscape, to before deliverable, Solution Configuration. Standard integrations should be set up before or in parallel with solution configuration.
  2. Added a new accelerator, Two-Tier ERP Deployment for SAP S/4HANA Cloud.pdf, to tasks, Review Overview Documentation and Define the Implementation Strategy.
  3. Removed accelerator, Side-by-Side Extensibility for SAP S/4HANA Cloud (1RW). It has been depreciated.
  4. Removed accelerator, EU General Data Protection Regulation, from task Review Data Protection Requirements and Functionality. Replaced the scope item, Data Protection and Privacy (1J7), with scope item, Data Protection and Privacy (5LE).

November 29 Release Notes

  1. Relocated deliverable, Quality System Request / Initial Setup, to Realize. Since SAP Central Business Configuration has removed the Activate phases from their process, we can present these actions at the beginning of Realize instead of the end of Explore. This is consistent to other Intelligent Enterprise applications. Explore now ends with a quality gate similar to other phases.
  2. Updated the deliverable title from Release Cycles for SAP S/4HANA Cloud to Release and Update Cycles for SAP S/4HANA Cloud since the deliverable now contains continuous feature delivery information.
  3. Added a new deliverable, Regression Test for SAP S/4HANA Cloud Upgrade, to the run phase after deliverable, Release and Update Cycles for SAP S/4HANA Cloud. Moved the regression testing related tasks from Release and Update Cycles for SAP S/4HANA Cloud into the new deliverable. This provides better visibility and organization of both upgrade and regression processes.
  4. Remodeled the task, Prepare for Quarterly Upgrade, to improve the flow and readability.
  5. Updated the procedure in task Execute Regression Testing.
  6. Remodeled the task, Evaluate and Activate Feature from Continuous Delivery. Updated the description and procedure to provide better user guidance. Added a link to the Release Assessment and Scope Dependency tool accelerator. Relocated to deliverable, Release and Update Cycles for SAP S/4HANA Cloud.
  7. Changed the procedure in task, Set Up Starter Project in SAP Central Business Configuration, to guide customers to create the starter project after initial access to the tenant which was previously defaulted into the system. Added a new accelerator, Help – Project Experience > Selecting Your Project (Initial Logon), to provide additional guidance.
  8. Updated the overview graphics for Chinese and Japanese.

November 15 Release Notes

  1. Updated task, Perform Manual Rework on Production System, to the new SAP Central Business Configuration milestone names. Similar changes also made in task, Request New Scope or Country/Region Activation via SAP Central Business Configuration.
  2. Removed from the Run phase the deliverable New User Setup and associated task Setup New Users. This level of detail is not required in Run.
  3. Added accelerators, Knowledge-Based Articles for Known Regression Issues.pptx and SAP Note 2951579 – Regression definition for SAP S/4HANA Cloud, to task Execute Regression Testing.
  4. Updated the Overview graphics to match the 2111 content.
  5. Updated the accelerator, Business Driven Configuration Questionnaire – AI Automation.xlsx, in task Perform Initial Business Process Assessment for SAP S/4HANA Cloud.
  6. Added accelerator, S4-HANA Cloud – Integration Scope Items in BPX, to task Determine Scenario Options for Integrations.

2111 Release Notes

  1. Changed the text related to the SAP Central Business Configuration phases in tasks Set Up Starter Project in SAP Central Business Configuration, Execute Initial Setup of the Quality System via SAP Central Business Configuration, Perform Manual Rework on Production System and Request New Scope or Country/Region Activation via SAP Central Business Configuration. SAP Central Business Configuration has renamed their phases to be more relevant to the activities performed and independent of the Activate phases.
  2. Updated the Service Center Cutoff Dates table in task Prepare for Quarterly Upgrade.
  3. Added new accelerator, Event-Based Revenue Recognition – Service Documents.pdf, to task Collect Details for Extensions.
  4. Expanded the SAP roles listed in accelerator SAP S/4HANA Cloud Onboarding Presentation.pptx to provide more detail along with other minor updates. This accelerator is attached to the task, Review Overview Documentation.
  5. Updated the procedure in task Request SAP Cloud ALM Tenant. Changed the related accelerator title to Help – Requesting SAP Cloud ALM from Help – SAP Cloud ALM Provisioning to match the page title.
  6. Changed the task sequence within deliverable Solution Configuration to better reflect the process execution in the field.
  7. Miscellaneous readability improvements to several deliverables and tasks.
  8. Check out the new SAP Activate community at SAP.com and Follow us for the latest information.

October 4 Release Notes

  1. Consolidated the content of tasks, Execute Transport Sprints via Manage Your Solution App and Execute Transport Sprints via SAP Central Business Configuration, into one task Transport Configuration.
  2. Reordered the tasks in deliverable Solution Configuration.
  3. Updated the procedure steps in task Request Expert Configuration.
  4. Added a new accelerator, Blog – User Authentication in SAP Central Business Configuration, to task Access the SAP Central Business Configuration. This blog provides details on how to manage business users in Central Business Configuration.
  5. Created a new accelerator, Blogs – SAP S/4HANA Cloud Test Automation Tool Search in the SAP Community, to link to blogs on Test Automation. The accelerator was added to task Self-Enable on Test Management and Tools and others.
  6. Updated the task Request Expert Configuration to include additional procedure notes and emphasize that expert confirmation is limited to a pre-approved list in the SSCUI and Expert Configuration
  7. Check out the new SAP Activate community at SAP.com and press the Follow button to Follow us for the latest information.

September 20 Release Notes

  1. Added a new tag, Professional Services, to highlight all task related to a Professional Services implementation of SAP S/4HANA Cloud.
  2. Updated the swim lane graphics in the Overview to better match the current content.
  3. Updated the Chinese and Japanese content to the 2108 release.
  4. New accelerator Blog – SAP S/4HANA Cloud Test Automation Tool – FAQ Blog Series added to task Create Test Process (Test Case) and other locations.
  5. Added a new accelerator, Fit-to-Standard Workshops – Mural Template, to task Prepare for Fit-to-Standard Workshops. Update the procedure text to include use of the accelerator.

September 3 Release Notes

  1. Added the task Self-Enable on the Fit-to-Standard Process to provide learning guidance related to the fit-to-standard process. Included in the task are links to a blog that contains fit-to-standard simulation videos. Blog – How to Conduct Fit-to-Standard Workshops in SAP S/4HANA Cloud Implementations – A Business Simulation.
  2. Consolidated several configuration tasks into one Configure SAP S/4HANA Cloud The eliminated tasks will be generated automatically in SAP Cloud ALM based on configuration options in SAP Central Business Configuration.
  3. Relocated task Ensure Project Team Members Access to the SAP Support Portal, SAP Best Practices Explorer, and SAP Customer Communities to under deliverable Getting Started with your SAP Implementation.
  4. Relocated deliverable SAP Supporting Implementation Tools Access to after deliverable Initial System Access for S/4HANA Cloud.
  5. Updated the bullets in task Develop the Data Migration Approach and Strategy.
  6. Updated the description of deliverable New Scope Activation via SAP Central Business Configuration.
  7. Updated tagging of Two-tier accelerators. Renamed the Two-tier tag to Hybrid Deployment (Two-tier ERP). Updated accelerator Two-Two Scenario.pptx accelerator to Hybrid Deployment (Two-Tier ERP).zip.

August 23 Release Notes

  1. Added two new tasks to enhance the deliverable Enablement Delivery. The new tasks are Initiate Delivery for Trainers and Plan Learning Logistics.
  2. Added a new accelerator, Help – RPA Job monitor guide, to task Monitor the Jobs in RPA Factory.
  3. Relocated the task Request Access to the SAP S/4HANA Cloud Release Assessment Tool to deliverable System Go-Live. The tool is based on the production system.
  4. Consolidated several ‘Configure…’ tasks in Solution Configuration into one task Configure SAP S/4HANA Cloud. The removed tasks will be added back in automatically in SAP Cloud ALM and will link to the activities in SAP Central Business Configuration.
  5. Added a new task Evaluate and Activate Continuous Feature Delivered to deliverable Continuous Improvement.
  6. Added accelerator SAP Note 3061520 – Key User Extensibility – Configure Setting to task Detail Design on Key-User Extensibility.

2108 Release Notes

  1. Refreshes to several slides in the Onboarding Presentation in task Review Overview Documentation.
  2. Updated the text in task, Self-Enable on SAP S/4HANA Migration Cockpit, to include the Migration Object Modeler.
  3. Updated the graphics in the Overview page to reflect the current deliverable structure.
  4. Added a new testing overview presentation, Test Management Guide, to task Self-Enable on Test Management and Tools.
  5. A new task, Evaluate and Request Test Data Refresh, was added to deliverable Ongoing System Operations. This task provides links to information on the new Test Data Refresh service.
  6. Various description and procedure updates to workstream Application Design and Configuration. This improves general usability and re-use in other S/4HANA roadmaps.
  7. Miscellaneous readability improvements to several deliverables and tasks.

July 2 Release Notes

  1. Added accelerator Backup and Disaster Recovery for S/4HANA Cloud.pdf to tasks Create a Strategic Road Map and Value Case and Access SAP Support Service.
  2. Created a new deliverable for Cloud Mindset Assessment and related task Execute the Cloud Mindset Assessment. Reassigned 3 accelerators. Added two new accelerators.
  3. Removed the SAP Cloud Trust Center deliverable and associated task. Removed deliverable Logging a Support Ticket and related tasks. Added a new task Access SAP Support Service in existing deliverable Ongoing System Operation.

June 21 Release Notes

  1. Relocated the Continuous Improvement deliverable in Run to after Release Cycles for SAP S/4HANA Cloud.
  2. Updated the task Create a Strategic Road Map and Value Case to include a procedure step to review the accelerator Customer CoE Strategy Governance and Organization
  3. Renamed Establish Support Processes task to Establish Support and Operation Processes. Renovated the description and procedure and added accelerator SAP Cloud ALM for Operations.
  4. Renamed task Ensure Project Team Members Access to the SAP Activate Methodology Jam Groups to Ensure Project Team Members Access to the SAP Activate Community. Updated the procedure to verify access to the SAP Activate Community.
  5. Updated the links to accelerators Help Import Collection and Help Export Collection in task Transport Extensibility Entities to P-System.

June 7 Release Notes

  1. Update the name of task Request and Initial Configuration of the Quality System via SAP Central Business Configuration to Execute Initial Setup of the Quality System via SAP Central Business Configuration. Removed the activity, Request Q-system, from procedure step 1. The request of the Q-system was moved to Starter Project.
  2. Updated task Set Up Starter Project in SAP Central Business Configuration to include the activity, Request Quality System, and other usability improvements.
  3. Add a new accelerator link, SAP ONE Support Regression Issue Search, to task Review Hotfix Collection Information. This KBA link will show the known issues related to a quarterly upgrade.
  4. Added a procedure step #3 to the task Self-Enable on Test Management and Tools to review the Cloud Tutorials.
  5. Released the 2105 Japanese and Chinese language content updates.
  6. Updated task Access SAP Cloud ALM and Create Users with a step 5 and other general improvements. When moving into CALM, some roadmap viewer tasks have already been performed and should be set to ‘Done’.
  7. Added the published date to the Overview view (right side) for better visibility of the latest update.
  8. Added a new accelerator, Standard Content Delivered API TDC UI Control Repository.xlsx, to task Edit Action Data and Change Visibility of Test Process.
  9. Revised the procedure note for task Request the Production System. The P-system creation will only trigger 2 emails since, in most cases, the production IAS has already been provisioned.
  10. Renamed the accelerator Help – Set Up SAP Central Business Configuration to Help – User Setup and Access in task Access the SAP Central Business Configuration.
  11. Removed procedure note references to RealSpend and SAP Financial Statement Insights (1KU) in task Finance – Conduct Workshop. This scope item is no longer offered.

May 24 Release Notes

  1. Added accelerator SAP Note 3032572 – S/4HANA Cloud Reports for Auditors to task Track Changes in Configuration for Manage Your Solution App to provide more information to users on auditing related information that you can access in SAP S/4HANA Cloud.
  2. Assigned new accelerator How to Integrate SAP S/4HANA Cloud with Payment Service Providers.pptx to task Finance – Conduct Workshop. Updated the procedure notes.
  3. Project plan download updated for 2105 content.
  4. Added two accelerators API Data Download – Technical Setup Document.pdf and API Data Download Process.pdf to task Create Initial Integration and API List.
  5. Revised the procedure in Access SAP Cloud ALM and Create Users to improve flow. Added a final step to continue with the Activate roadmap in the SAP Cloud ALM tool instead of the SAP Activate Roadmap Viewer. Added Blog – Project Setup in SAP Cloud ALM to guide the project set up.
  6. Updated the title of task Determine the Migration Objects for S/4HANA Cloud to Determine the Required Master Data and Transactional Data for S/4HANA Cloud. Updated the description and procedure to better readability.
  7. Updated the title of task Download Migration Object Templates for S/4HANA Cloud to Determine Migration Cockpit Field Structures for S/4HANA Cloud. Slight readability changes to the procedure.

2105 Release Notes

  1. Improved Activate Roadmap Viewer tool to include interactive help and direct access to ‘What’s New’. SAP Activate Methodology for SAP S/4HANA Cloud
  2. Renamed task Set Up selected Test Automation Tools to Set Up Selected Third Party Automated Testing Tools.
  3. Updated the guidance in task Execute Regression Testing.
  4. Added accelerator Intelligence Technologies for S4HANA Cloud.pdf to task Create Initial Artificial Intelligence List.
  5. Replaced the S/4HANA Cloud Product Roadmap.pptx accelerator with a link to the new SAP Road Map Explorer This accelerator is linked to several tasks.
  6. Updated several setup guide accelerators to include both the SAP Central Business Configuration and Manage Your Solution scenarios of configuration.
  7. Remodeled Self-Enable on the Test Automation Tool for SAP S/4HANA Cloud to include the broader subject of testing. Renamed to Self-Enable on Test Management and Tools.
  8. Renamed task Document Scope Bundle to Document Scope Bundle for Manage Your Solution App. Added a qualifier that the task is only relevant to Manage Your Solution configuration scenarios. Added the accelerator link to SAP S/4HANA Cloud Release Restrictions.
  9. Several accelerator updates related to the 2105 release and general content improvements.
  10. Miscellaneous readability improvements to several deliverables and tasks.

April 5 Release Notes

  1. Enhanced the differentiation between the deliverables/tasks for customers configuring with SAP Central Business Configuration and customers still configuring with the Manage your Solution This includes title description enhancements. Examples of the new text can be viewed via task Request and Initial Configuration of the Quality System via SAP Central Business Configuration and task Request Quality System via Manage Your Solution App. Several deliverables and tasks were improved.
  2. Added a new tag to identify the tasks that are relevant to projects configuring with the new SAP Central Business Configuration Manage your Solution specific tasks are not tagged (14).
  3. Replace accelerator Process Steps, Business Roles, and Apps.xlsx with Create Application – Workplace List.pdf. The accelerator is referenced in several tasks including Prepare for Fit-to-Standard Workshops
  4. Added accelerator Quarterly Release/Upgrade Schedule to task Create and Schedule Test Plan
  5. Updated the Configure Tax Solution task to include instructions on configuring tax code for Pro Rata VAT.

March 22 Release Notes

  1. Added a new accelerator E-book – Migrating to SAP S/4HANA to tasks Self-Enable on the SAP S/4HANA Migration Cockpit and Develop the Data Migration Approach and Strategy.
  2. Promoted the procedure note to step six in the procedure of task Create Cutover Plan and Documentation. Changed the cutover schedule review window to greater than 4 weeks.
  3. Renamed accelerator AI Master List to GTM Use Cases.xlsx in task Create Initial Artificial Intelligence List and others.
  4. Updated Execute Transport Sprint task procedure notes with reference to the limitation of activities due to system locks in transports SAP Note 3024158 – Blue-Green Deployment for Hotfix Collection for RISE with SAP S/4HANA Cloud. Central Business Configuration task Execute Transport Sprints in SAP Central Business Configuration also updated.
  5. Updated the name SAP Cloud Platform to SAP Business Technology Platform in several tasks, deliverables and accelerators.
  6. Updated the procedure in task Create Users in the Starter System by consolidating both Central Business Configuration and MyS procedures. Added a new accelerator link that contains both instructions. Similar changes made to Create Users in the Quality System and Create Users in the Production System. Removed accelerator SAP Note 2974809 – User Onboarding for SAP S/4HANA Cloud.
  7. Improved the description and procedure in data management task Load Data into the Staging Tables of SAP S/4HANA Migration Cockpit.
  8. Refined the procedures related to SAP Central Business Configuration in tasks Set Up Starter Project in SAP Central Business Configuration, Request and Initial Configuration of the Quality System in SAP Central Business Configuration, and Create Preset Configuration User in the Quality System.
  9. Renamed task Receive Starter System and Reset Password, Access Starter System and Reset Password.
  10. Added a procedure step #7 to task Configure Identity and Access Management in the Q-System.
  11. Add a new task Create Self-Enablement Plan under deliverable Customer Team Self-Enablement to facilitate learning.
  12. Removed deliverable End User Learning Strategy. Added 3 new enablement related deliverables and associated tasks to the Prepare phase. The deliverables are: Enablement Assessment, Enablement Strategy, Learning Needs Analysis for Users, and Content Development Tool Deployment.
  13. Removed deliverable Learning Team and related tasks from the Explore phase.
  14. Removed deliverable Learning Content. Added deliverables and associated tasks to the Realize phase. The deliverables are: Enablement Content Development, Enablement Delivery.
  15. Removed deliverable Continuous Learning. Added deliverable User Experience Management Tool Deployment and associated tasks to the Run phase.

March 8 Release Notes

  1. Updated the name of the SAP Cloud Platform Identity Authentication Service to Identity Authentication service. This impacts the texts of several tasks and title of one accelerators. Task example: Self-Activation of Project Team Members in the Identity Authentication Service Accelerator: Help – Identity Authentication Service
  2. Updated the title of task Set Up Starter Project in SAP Central Business Configuration along with updates to the description, procedure and procedure notes.
  3. Remodeled several tasks in the Data Management workstream for improved usability and consistency with the other roadmaps.
  4. Added a procedure note to Create Initial Integration and API List. Removed accelerator Situation Handling_2020.pdf.
  5. Relocated Set Up Integration in the P-Landscape using Cloud Integration Automation Service (CIAS) to the first task in deliverable Integration Setup in the Productive Landscape.
  6. Added a New task Review Hotfix Collection Information in the deliverable Ongoing System Operations.

February 22 Release Notes

  1. Updated the procedure notes in task Executing a SAP Digital Discovery Assessment to include a reference to Integration Suite use cases.
  2. Updated the procedure in Set Up Integration using Cloud Integration Automation Service (CIAS), replaced the accelerator CIAS Scenarios Direct Links.xlsx with link CIAS-Integration Solution and Scenarios.
  3. Updated the Business Driven Questionnaires to release 2011 (lags 1 release) in task Perform Initial Business Process Assessment for S/4HANA Cloud.
  4. Reduced the accelerator list in task Review Overview Documentation. The removed accelerators are available elsewhere in the roadmap.
  5. On several testing tasks including Self-Enable on the Test Automation Tool for SAP S/4HANA Cloud, links to accelerators Test Your Processes User Guide.pdf, Manage Your Processes User Guide.pdf, and Analyze Automated Test Results User Guide.pdf have been converted to HTML links pointing to the help documentation. This impacts the categorization in the accelerator section of the assigned tasks, but the content remains the same.