Should We Count Story Points for Unfinished Stories?
Unfinished stories is a smell and the root cause in general may lie somewhere else. Why don’t we try to fix the root cause first as much as possible?
This generally happens when a team practices “swim-lane Scrum”(an anti-pattern) instead of collaborative Scrum. In “swim-lane” Scrum, each team member individually takes the ownership of a story through the stages of the process. That results in WIP (Work in Process) equal to the number of team members, at any point of time.
If an individual gathers up multiple stories, or tries doing all the tasks in the story at once, you can get the context switching that comes from having too much work in progress. All that results in even higher WIP.
This higher WIP results to leakage in form of unfinished stories.
Let’s take an example. A team of three practices “swim-lane” Scrum. Each team members picks one story at a time and move that to in-progress.
As you see in above picture, this team has a high probability of leakage. There is a probability of not finishing all 3 in-progress stories at the end of a sprint.
Any leakage in form of unfinished story is a waste for the business for that sprint.
Reducing the Leakage through One Piece Flow
Let’s see how to reduce this leakage to the extent possible.
This team of 3 changes the stance and starts practicing One-Piece Flow. They swarm around one story at a time and finish it earlier than the time it would have taken for one person to finish.
The WIP in this case is 1 (lower) which otherwise would have been 3 in case every individual would have picked one story.
As this swarm picks and finishes one story at a time. At any point of time, they will have at most 1 unfinished story compared to probable 3 unfinished story if all 3 people would have worked on individual story. This improves overall throughput (as you finish more) and reduces waste.
Reducing WIP here reduces leakage because neither of the 3 developers may deliver anything even though they are 90% done, whereas having everyone work together raises the chances that they will deliver at least the first two.
What should we do for last unfinished story?
With One-piece flow idea we could reduce the amount of leakage. However there is still a probability of last story to remain unfinished. Should we count the story points of unfinished story then in current sprint? Or should we divide the story points, e.g. out of 5 story points 3 are done and the remaining 2 are moved to next sprint?
The problem is – anything undone is not DONE and is not potentially shippable. Instead of counting partial story points, how about moving entire unfinished story to the next sprint. So in above case, no story point gets counted in the current sprint and entire undone story moves to next sprint.
People may ask why not count the work done in the current sprint? The issue is – this creates more problems than it solves. The team may remain content in delivering undone stories as their story points for undone stories are counted anyways. The focus for a team moves to accomplishing the story points in a sprint instead of delivering business value.
Another point to remember is – velocity is NOT an absolute number for a team. Instead it’s the average of story points finished in last 3 sprints. So even if entire story moves to next sprint, the average may still remain same. Let’s take an example to understand it.
Let’s say a team forecasted 20 story points to complete in a sprint. For some reason, they could finish 15 story points only and last story with 5 story point still had 2 hours of work remaining. As it remained undone, the Product Owner decided to move it to the next sprint.
The team decided to take 20 story points for the next sprint as well. And they took this undone story of 5 story points as well alongside. So the total story points they collaboratively planned to do were 25. In this sprint, the team finished 25 story point. Similarly in sprint 3 they finished 20 points.
If you take the average of 3 sprints, the number of average story points is 20 which is completely fine.
More on Story Points and Agile Estimation
This post is a part of a blog post series on story points and agile estimation. To read rest of the posts on the subject, please navigate to All About Story Points and Agile Estimation Series.
Recommend
-
94
Saturday Morning Breakfast Cereal Permalink for sharing! Seattle BAHFest is no 50%...
-
79
I never complained about my phone before, but now here's my collection of bugs in the apparently unfinished iOS 11.2. Photos from iPhone 7+ 256GB on iOS 11.2. I never complained about my phone before, but now...
-
41
Note: This is an unfinished work. Feel free to read and/or share it, but please do not post it to discussion sites like Hacker News or Reddit until this disclaimer has been removed. Thank you. In
-
9
This is an unfinished work. I am still trying to think through all of the implications of binding names to entities using test suites. It seems fairly obvious how it would work with Ruby Gems. But does it scale downwards? Can I specify a...
-
9
November 2020 The power of unfinished How to get more done, uplevel your craft, and create work that gets noticed Reaching...
-
5
alpha means alpha — The Windows 11 insider build is surprisingly unpolished and unfinished Windows 11 looks to be a decent upgrade, but not one to lose sleep over missing....
-
11
Like Article Count number of intersections points for given lines between (i, 0) and (j, 1)Last Updated : 17 Nov, 2021Given an
-
15
Annals of TechnologyThe Strange, Unfinished Saga of Cyberpunk 2077How a video game that imagined a bleak f...
-
12
An introduction of ASVspoof (unfinished) May 15, 2022 About 1 min ASVspoof(Automatic Speaker Verificat...
-
6
Should We Use T-Shirt Sizing Instead of Story Points? By ShriKant Vashishtha
About Joyk
Aggregate valuable and interesting links.
Joyk means Joy of geeK